Description:
|
The project site is located within the Gharrett Street right-of-way corridor between 55th Street and Cardinal Drive in Missoula, Montana. The work generally entails street reconstruction and new storm drain installation, including 842 LF of curb and gutter, 2,154 SF of concrete sidewalk, 1,968 CY of excavation above subgrade, 3,439 SF of 6” and 8” thick concrete, 768 LF of 18” and 24” storm drain pipe, a hydrodynamic separator unit, storm drain structures, and associated demolition, excavation, signing, surface restoration, and related work in accordance with the Plans and Specifications.
|
Publication Date/Time:
|
3/5/2023 8:00 AM
|
Publication Information:
|
March 5, 2023, March 12, 2023
|
Closing Date/Time:
|
3/22/2023 2:00 PM
|
Submittal Information:
|
www.questcdn.com
|
Pre-bid Meeting:
|
3/14/2023 at 2:00pm
|
Contact Person:
|
Questions regarding the project manual, drawings and specifications shall be directed to the Engineer: WGM Group, Inc. at 1111 East Broadway, Missoula, MT 59802 via phone at (406) 728 4611 or email at Eanderson@wgmgroup.com. Questions submitted after 4:00 p.m., local time, on March 15, 2023, are not guaranteed to be answered before the bid due date and time.
|
Related Documents:
|
|
|